1. A business analyst has been assigned to a project that will design and build two new bridges and, at the same time, redesign a failing bridge for a local structural engineering company. All three bridges must be constructed and meet all safety requirements before flood season next spring. How would the business analyst define the scope of this project?

A) Perform a feasibility study.
B) Perform a structured walkthrough.
C) Perform process modeling.
D) Perform a work breakdown structure.



2. The stakeholders for a newly approved project are subject matter experts who are very knowledgeable in the clientâ??s business and will provide the project requirements. The project team scheduled separate sessions with each subject matter expert to identify and prioritize the requirements. Which technique is being used?

A) Brainstorming
B) Workshop sessions
C) Idea and mind mapping
D) Delphi technique



3. After reviewing a business case, project goals, and objectives, a business analyst determines that the organization prefers taking an exploratory approach to finding the solution that best meets the business need. Which approach best aligns with the business need for this organization?

A) Plan-driven approach
B) Analytical approach
C) Waterfall approach
D) Change-driven approach



4. After completing the requirements, the project manager and business analyst realize that the project scope is not feasible in the projected schedule. The business analyst needs to review the amount of work the team is capable of delivering based on the approved project schedule. Which prioritization technique should the business analyst use?

A) Time-boxing
B) Weighted ranking
C) Multivoting
D) SWOT analysis



5. Which tool should be used to improve the communication of product needs with the stakeholders and to improve their understanding?

A) Requirements management tool that documents requirements and their properties and relationships.
B) Modeling tool integrated into a version control feature that ensures that team knowledge is captured
C) Document management system and a relationship matrix that groups all related documents
D) Workflow management tool that documents the flow of information



1. Right Answer: D
Explanation:

2. Right Answer: C
Explanation:

3. Right Answer: D
Explanation: https://www.slideshare.net/carlitos5071989/babok-v20

4. Right Answer: A
Explanation: https://book.akij.net/eBooks/2018/September/5b8a80dd494ce/BABOK_Guide_v3_Member.pdf

5. Right Answer: A
Explanation: